CONSTRUCTION OF SHAMAKHI – PIRGULU ROAD

Construction of 12,5 km 2 lane road and 2 nos. bridges with the total length of 84 m.

CONSTRUCTION OF GUSAR – ENIG – LAZA – SUVAR ROAD

Construction of 38 km 4 lane road and 3 nos. bridges with the length of 65 m, 73 m and 88 m.

CONSTRUCTION OF SHEMKIR – GEDEBEY ROAD

Construction of 22,5 km 2 lane road and three spans bridge with the length of 53 m.

2014 – 2015

49 173 329,72 USD

Lengths 58.54 km

RECONSTRUCTION OF ROADS IN AGDASH TOWN

Reconstruction of roads of provincial importance in various streets of Agdash town with total lengths of 58.54 km and 1 bridge with the total area of 336 m2.


The scope of works include but not limited:

  • earthworks 116 830.33 m3;
  • subbase and base 45 224.64 m3;
  • asphalt-bitumen hot mix 56 530.80 m3;