Projects

Last projects


CONSTRUCTION OF SHAMAKHI – PIRGULU ROAD

Construction of 12,5 km 2 lane road and 2 nos. bridges with the total length of 84 m.

CONSTRUCTION OF GUSAR – ENIG – LAZA – SUVAR ROAD

Construction of 38 km 4 lane road and 3 nos. bridges with the length of 65 m, 73 m and 88 m.

CONSTRUCTION OF SHEMKIR – GEDEBEY ROAD

Construction of 22,5 km 2 lane road and three spans bridge with the length of 53 m.

2011 – 2013

45 127 627,92 USD

Length 22.5 km

CONSTRUCTION OF SHEMKIR – GEDEBEY ROAD

Construction of 22,5 km 2 lane road and three spans bridge with the length of 53 m.


The scope of works include but not limited:

  • earthworks 806 250.0 m3;
  • sub-base 70 312.50 m3;
  • base 42 187.50 m3 and asphalt-bitumen hot mix 67 500.00 m3