CONSTRUCTION OF AGSTAFA – POYLU – GEORGIAN BORDER ROAD

Construction of 29,5 km 2 lane road.


The scope of works includes but not limited:

  • earthworks 621250.00 m3;
  • subbase 92 187.50 m3;
  • base 55 312.50 m3;
  • asphalt-bitumen hot mix 88 500.00 m3;