July 2017 - October 2018

96 384 145,81 UAH

length - 294.82 m, width - 35.16 m

Solomensky district, Kiev, Ukraine

CAPITAL PIPELINE REPAIR BY KOMAROVA AVENUE – LEPSE BOULEVARD

The overhaul of the overpass at the intersection of Cosmonaut Komarova Avenue and Ivan Lepse Boulevard in Solomyansky District, Kiev. Adjustment.

According to the design task, major repairs to the construction are carried out (reconstruction of structures and replacement of bridges, roadway approaches). The elevation of the structure is unaltered.

Main technical characteristics:

  • the length of the overpass after the execution of works - 84.68 m;
  • static circuit - 5 x 16,76 m;
  • dimension of overpass - 0,75 + 7,00 + 7,00 + 0,75;
  • the width of the tram piece is 16.01 m;
  • length of approaches with retaining walls - 210,14 m.