CONSTRUCTION OF MINGECHEVIR KHALDAN ROAD

Construction of 30 km 2 lanes III category road and seven spans bridge over the Kura river with the length of 154 m.

The scope of works include but not limited:

  • earthworks 287 620.00 m3;
  • subbase 68 435.00 m3;
  • base 35 750.00 m3;
  • asphalt-bitumen hot mix 23 920.00 m3;