Projects

Last projects


CONSTRUCTION OF SHAMAKHI – PIRGULU ROAD

Construction of 12,5 km 2 lane road and 2 nos. bridges with the total length of 84 m.

CONSTRUCTION OF GUSAR – ENIG – LAZA – SUVAR ROAD

Construction of 38 km 4 lane road and 3 nos. bridges with the length of 65 m, 73 m and 88 m.

CONSTRUCTION OF SHEMKIR – GEDEBEY ROAD

Construction of 22,5 km 2 lane road and three spans bridge with the length of 53 m.

2013 – 2014

36 090 225,56 USD

length 19,2 km

CONSTRUCTION OF GOYCHAY – UJAR III CATEGORY ROAD

Construction of 19,2 km 2 lanes III category road and 4 of bridges:

  • one span bridge with the length of 36 m;
  • one span bridge with the length of 24 m;
  • 3 span bridge with the length of 42 m and 3 span bridge with the length of 48 m;

The scope of works include but not limited:

  • earthworks 437 650.00 m3;
  • subbase 132 670.00 m3;
  • base 45 921.00 m3 and asphalt-bitumen hot mix 35 328.00 m3;