CONSTRUCTION OF SHAMAKHI – PIRGULU ROAD

Construction of 12,5 km 2 lane road and 2 nos. bridges with the total length of 84 m.

CONSTRUCTION OF GUSAR – ENIG – LAZA – SUVAR ROAD

Construction of 38 km 4 lane road and 3 nos. bridges with the length of 65 m, 73 m and 88 m.

CONSTRUCTION OF SHEMKIR – GEDEBEY ROAD

Construction of 22,5 km 2 lane road and three spans bridge with the length of 53 m.

September 2017 - October 2021

780 000 UAH

Ukraine, Dnipro

European Bank for Reconstruction and Development

THERMOMODERNIZATION OF BUILDING OF BUDGET INSTITUTIONS IN DNIPRO

Energy service contract for energy efficiency improvement on implementation of energy saving measures, thermo-modernization of 84 buildings of budget institutions with the achievement of guaranteed energy savings in the m Dnipro. Number of buildings for schools and kindergartens - 84.

The project was prepared on the basis of standard tender documents of the European Bank for Reconstruction and Development for the Supply and Installation of Equipment and Equipment under the 2-step procedure.

The goal of the project is to implement measures to improve energy efficiency in 84 schools and kindergartens in the Dnipro municipality, using the principles of energy service contracts for energy efficiency improvement, including, but not limited to, the following works and services:

  • thermodynamic of facade structures of buildings
  • replacing windows
  • thermal modernization of ceilings, basement ceilings
  • modernization / installation of automatic heat supply units
  • installation of coolant flow controllers СО (hydraulic balancing of the heating system)
  • installation of heat energy meters
  • isolation of pipes of the heating system
  • activities in the internal heating system (for example, installation of radiator thermostatic regulators with pre-setting)
  • replacement of lamps for indoor lighting and street lighting
  • A new energy service contract for energy efficiency improvement (hereinafter referred to as "ESKnPe") will be used, which was developed within the framework of the Bank's preparatory project.

    Activities within the proposed ESCP will include:

    1. Development of energy-efficient measures

    2. Implementation of the proposed energy-efficient measures

    3. Perform the necessary control and verification of achieved energy savings

    4. Guarantee of achievement of operational (energy) economy within 2 (two) years from the moment of commissioning of energy efficiency measures for the Customer