August 2018 - October 2018

1 490 647,20 UAH

The heat supply network is 298 m, 331 m, 210 m and 539 m

Ukraine, Zhytomyr city

RECONSTRUCTION OF THERMAL BOILER NETWORKS IN ZHYTOMYR

The project involves replacing the pipes of the heating network of the boiler-house RK-10 from TK-1 to TK-2 in Zhytomyr. Existing pipelines must be dismantled.

The initial project for this contract provides for the installation of pre-insulated pipes with polyurethane foam and SPIRO metal sheath for the existing ferro-concrete and metal supports for the ground installation in accordance with DSTU B В.2.5-31: 2007, in the underground and underground tunnels.

The project envisages:

- Dismantling the existing steel T1 and T2 insulated tubes from TK-5 to TK-9 in the existing pass tunnel

- Dismantling of existing steel hot-water insulated pipes in the existing pass tunnel

- Dismantling the existing steel gate valves in the heat sockets

- Installation of steel pre-insulated pipes with polyurethane foam and SPIRO metal sheath in an existing pass tunnel

- Installation in thermal units of steel weld valves