Asian Development Bank (FIDIC Red Book)

10/08/2012 – 20/06/2017

74,095,337.62 USD

Completion of Construction of Water Intake Facilities and Rehabilitation of Water Supply and Sewerage Networks in Agdash Town

Contract No.: MFF032-T2-ICB-1.01/PM-1

Scope of the project has comprised the construction (including digging, installation and backfilling, road reinstatement)

  • water supply network in length of 134.500,0 m;
  • sewerage network in length of 127.900,0 m;
  • road reinstatement 262.400,0 m;
  • 1 unit water reservoir V=5000 m3;
  • 5 units artesian wells;
  • 5 units of pumping station;

Construction, installation and civil works of 4 pcs artesian wells with depth of 130 m, a water reservoir with capacity of 5000 m3, DN 225*400 mm HDPE water collector line with total length of 996 m, DN 560 mm HDPE main transmission line with length of 6.250 m, PE water distribution line with total length of 143,182 m (D 110mm–115 010 m, D 160mm–14 648 m, D 225mm–7 363 m, D 280mm–6 504 m, D 355mm–1293 m, D 450mm–982 m, D 560mm–982 m), CHDPE sewerage network with total length of 116,827 m (D 200mm–93 364 m, D 300mm–15 377 m, D 400mm–8 799 m, D 500mm–2 845 m), D 600 mm CHDPE sewer collector with length 3 558 m, 5 965 pcs water and 5 876 pcs sewer house connections on “free issue material” basis.