Projects

Last projects


CONSTRUCTION OF SHAMAKHI – PIRGULU ROAD

Construction of 12,5 km 2 lane road and 2 nos. bridges with the total length of 84 m.

CONSTRUCTION OF GUSAR – ENIG – LAZA – SUVAR ROAD

Construction of 38 km 4 lane road and 3 nos. bridges with the length of 65 m, 73 m and 88 m.

CONSTRUCTION OF SHEMKIR – GEDEBEY ROAD

Construction of 22,5 km 2 lane road and three spans bridge with the length of 53 m.

2013 - 2014

45 771 131,87

ENGINEERING AND CONSTRUCTION OF PUMPING STATION IN LOKBATAN

Engineering and construction of pumping station with the power of 27 500 m3/hour and electrical generating station for wastewater treatment Unities in Lokbatan.