CONSTRUCTION OF SHAMAKHI – PIRGULU ROAD

Construction of 12,5 km 2 lane road and 2 nos. bridges with the total length of 84 m.

CONSTRUCTION OF GUSAR – ENIG – LAZA – SUVAR ROAD

Construction of 38 km 4 lane road and 3 nos. bridges with the length of 65 m, 73 m and 88 m.

CONSTRUCTION OF SHEMKIR – GEDEBEY ROAD

Construction of 22,5 km 2 lane road and three spans bridge with the length of 53 m.

2013 - 2015

78 586 624, 20 USD

Ceyranbatan WTP (Water Treatment Plant) with Advanced Ultrafiltration Technology

Engineering and construction of ultrafiltration water treatment unities Ceyranbatan with capacity of 520 000 m3 per day, installation of SCADA system.