Projects

Last projects


CONSTRUCTION OF SHAMAKHI – PIRGULU ROAD

Construction of 12,5 km 2 lane road and 2 nos. bridges with the total length of 84 m.

CONSTRUCTION OF GUSAR – ENIG – LAZA – SUVAR ROAD

Construction of 38 km 4 lane road and 3 nos. bridges with the length of 65 m, 73 m and 88 m.

CONSTRUCTION OF SHEMKIR – GEDEBEY ROAD

Construction of 22,5 km 2 lane road and three spans bridge with the length of 53 m.

KFW

February 2018 - February 2019

10,249,187.69 Euro

Albania: Skenderaj, Kurdari, Suç, Kujtim villages.

Construction/Reconstruction of Water Supply Systems in Rural Areas in Albania

Construction/Reconstruction of Water Supply Systems in Rural Areas in Albania - Lot 2”, RWSP-WS-ICB-2018-2

The project concerns the construction of a new water supply system for the peri-urban location with multi-functional buildings within the administrative unit of Rrashbull, named Shkembi I Kavajes, currently having a population of 4200 inhabitants. As the village is close to the beach of Durres, there are also two bigger hotels in town.

The project area is located south-east of the city of Durres.

Description of works:

The Works comprise the construction/reconstruction of the water supply systems for the villages Zall-Bastar, Zall-Dajt, Shengjin I Vogel, Besh, Vilez Upper and Vilez Lower, and the emergency sanitation measures for protection of the spring Gurra e Madhe in Tirana Municipality (Project No. 001ZAL).

Chlorination building,3 new Reservoir: 1-unit V= 75 m3, 2-unit V= 50 m3, Reconstruction of 2 reservoir V=100m³ and V=50 m³, Transmission main pipes (L=19.6 km), Distribution Network (L=37.3km), Water Supply House Connection, Electrical Power Supply Line.